Spring Bank PLC
|
- Sun Data Center deployment (Sunfire E20K X2), one at production site and one at DR site
- Sun StoreEdge SE3510 storage, total of 4.2 terabytes
- Sun tape drive C4 LTO
- Each E20K server partitioned into 3 domains, running Application server, Database server, Central Stand-in-server & connect24 server (for linking internet customers, ATMs and other service outlets)
- Full maintenance and support of the infrastructure
|
MTEL
|
- Sun Data Center server deployment (Sunfire E12K x1)
- Sun storage SE 5320 storage
- Sun storagetek L700 tape drive
- the above are running Customer Care and billing system
- Sunfire V880 Enterprise server running Interconnect
- Full maintenance and support of the infrastructure
|
NITEL
|
- Sunfire (4800 X 2) in a cluster running Mediation and activation
- Sun storage SE 6320
- Sun storage L100 tape drive
- Support, maintenance and Training
|
OandO
|
- NetApp storage (FAS 250 X 2)
- Microsoft Exchange and Online Backup
- Total storage is 4 terabytes
|
First Inland Bank PLC
|
- Deployment of Sun Enterprise server (Sunfire SF4800 X 2) in a failover environment
- Storage Consolidation and Disaster Recovery for Core Banking Application (Finacle)
- NetApp storage (FAS 3020 X 2) total of 4 Terabytes
- Sun Tape drive L8
- Sun server (E450 X 3) for Test & Development Environment
- Above servers are running Finacle Application, Oracle database and CSIS & Connect24 servers in different domains
- Full maintenance and support of the infrastructure
|